
Compact
Renovation of church, Paroissiale Saint-Martin - Arlon
Reliable, emission-free power for a Liebherr crane : without downtime, without noise.
(Galère - Renovation Paroissiale Saint-Martin, Arlon)
When renovating the church in Arlon, contractor Galère ran into a classic problem:
the existing 63A mains connection proved far too weak to safely power a Liebherr 130 EC-B.
After all, during peak operations, consumption rises to 125 kVA, with the risk of shutdown or downtime.
The Neargrid Compact solved that problem completely emission-free.
The battery automatically caught every peak load, kept the voltage perfectly stable and allowed the tower crane - and the yard - to continue working continuously.
Why the Compact made the difference here
- Peak power without heavy grid connection
The Compact delivers up to 67 kVA of peak power, ideal for self-built cranes and medium-sized tower cranes on weak or variable connections.
- Quiet & emission-free : crucial in urban renovation
No vibrations, no soot, no nighttime complaints or sabotage.
The Compact operates whisper quietly and fits perfectly in residential areas.
- Real-time insight via Neargrid Portal + SMS alerts
Galère received continuous visibility of consumption, peaks and autonomy.
Any deviation automatically alerted the site team.
- Active monitoring by Neargrid
Our team co-monitors every Compact 24/7.
If a fault or abnormal load is detected,
then we intervene proactively, before the construction site notices.
Result
A completely worry-free, stable and emission-free power supply for a crane that would normally require a much heavier infrastructure.
No downtime. No additional costs. No hassle.
Compact size, maximum reliability, just what an inner-city renovation needs.

Date
June 2025
Location
Arlon, Belgium
cranes
Liebherr 130 EC-B
Grid connection
63A - 3f - 400V


.jpg)
.png)
