Peak power tower crane: this is how to work emission-free without grid problems

November 27, 2025
-
5
min read

Tower cranes require extreme power for only a few seconds. That brief surge causes most of the problems on the construction site: downtime, rejected connection requests, waiting time for grid reinforcement, and forced diesel generators.

Yet that is not necessary.

With Neargrid battery systems, you buffer peak power and run tower cranes emission-free, quietly and reliably, even on a small 32A-63A-80A connection.
Without diesel. Without noise. Without waiting time on the grid.

Why peak power is the cause of 90% of power problems on construction sites

Although a tower crane can demand peak power of 120-160 kW, the actual continuous consumption is often only around 20-25 kW.

That difference is huge.

And exactly that short peak provides:

- rejected grid connections

- waiting months for wholesale consumption

- emergency generators of 100-200 kVA

- risk of downtime at net dips

How Neargrid solves peak power (without grid reinforcement)

Neargrid battery systems capture tower crane peaks as well as stabilize voltage thanks to our proprietary microgrid platform.

Here's how it works:

1. The Neargrid unit is located between the grid connection and the yard.

2. During hoisting, the battery provides the extra power.

3. During rest periods, it automatically recharges to the grid.

4. Everything is monitored through the Neargrid Portal (power, CO₂, alarms).

Benefits for contractors:

✔ Yard starts right away, without grid reinforcement

✔ Up to 85% CO₂ reduction compared to diesel.

✔ Mouse quiet → no neighborhood complaints or sabotage

✔ UPS function → no downtime in case of mains failure

✔ Less wear on cranes due to stable tension

Case: 3 tower cranes on 80A grid connection - City Hall Amersfoort

Contractor: Dura Vermeer
Location: Amersfoort, NL
Tower cranes: 3 × Liebherr 280 EC-H
Grid connection: 80A only
Solution: 3 × Neargrid Boost 200

What was resolved

No grid reinforcement available

Too small connection for 3 heavy tower cranes

Inner-city environment → no diesel allowed

Deadlines → yard had to start immediately

Result

All three tower cranes run stably at 80A

No diesel

No waiting time

100% uptime thanks to microgrid stability

Quiet yard → no complaints from local residents

Monitoring & alarms via Neargrid Portal

This project has become the Dutch reference case for emission-free operation in grid-congested areas.

Read more about this project


Peak power that Neargrid can accommodate

Up to 360 kW per unit (Force-range).

Autonomy in the event of grid failure

4-8 hours for typical tower crane load

Up to 20 hours before the Force

Compatibility

Works in parallel with the grid

Captures voltage dips

Active genset control (hybrid possible)

Monitoring

Via Neargrid Portal:

real-time power

historical trends

CO₂-saving

event text alerts

The ROI: why Neargrid is cheaper than diesel AND than grid reinforcement

Many contractors underestimate the total diesel cost:

Fuel → 4× more expensive than electricity

Rental generator → 100-200 kVA

Maintenance & downtime

Noise pollution → risk of sabotage

Inefficiency (5% conversion)

With Neargrid:

⚡ Yard runs on cheap grid electricity rate

⚡ No maintenance

⚡ No downtime

⚡ No CO₂ emissions

⚡ No grid reinforcement required.

Each liter of diesel saved = 2.6 kg of CO₂ less emissions.

Calculate your savings in 1 minute

Compare directly: Start your calculation

1. Your savings compared to a heavy wholesale connection
(CAPEX + fixed charges + connection costs) : Start your savings calculation

2. Your savings vs. diesel generators
(fuel, rental, maintenance, downtime) : Start your savings calculation

Find out why Neargrid is in most cases a lot cheaper than a wholesale connection, with no waiting, no hassle, only profit. Calculate your savings with a Neargrid battery

Compare with wholesale and diesel and find out immediately your profit in euros and CO₂.

Conclusion: Construction doesn't have to wait for power, neither does your project

With Neargrid, you start your construction site immediately, even when the grid is weak or overloaded.

No peak problems

No downtime

No diesel

No noise

No waiting time

Just reliable, emission-free power. Always.

Related articles

CO₂ reduction increasingly determines who gets the award

Projects: Ghent University Hospital, Royers Lock, Dijon